logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2016.11.08 2015가단108495
손해배상(기)
Text

1. The defendant (consolidated defendant) committed a 67,389,190 won against the plaintiff (consolidated defendant) and its related thereto from August 23, 2016.

Reasons

The cases of consolidation shall be considered together with the cases of consolidation.

1. Grounds for recognition;

A. On August 29, 2014, the Plaintiff entered into a contract with the Defendant for the construction of B neighborhood living facilities and multi-family houses [the instant building] (hereinafter referred to as “instant construction”) with the agreement on the construction of the instant construction project (hereinafter “instant construction”) from September 1, 2014 to January 3, 2015, by stipulating that the construction period of KRW 480,000,000 for the construction period of KRW 480 to January 3, 2015 (hereinafter referred to as “instant contract”).

Terms and Conditions of the Contract for Construction Works (1)

1.The down payment method 1) The down payment shall be paid 10 per cent (10%) at the time of the contract. (2) The payment shall be made 10 per cent after the completion of the basic civil works.

3) 15 per cent after completion of the 1st and the 2nd structural aggregate works shall be paid. 4) 15 per cent after completion of the 3rd structural aggregate works shall be paid.

5) 20 per cent after completion of funeral works shall be paid. 10 per cent after completion of funeral works shall be paid. 6) 20 per cent after completion of completion inspections and completion of follow-up works shall be paid.

2. 기타사항 -중략- 4) 착공일자는 건축허가일자 후부터 환산하며 준공예정일자도 순연된다. -중략- 7) 외벽 콘크리트 두께는 20cm 이상으로 하고, 스치로폼 단열재는 10cm 이상으로, 스타코 마�은 5cm 등 총합 35cm 이상으로 시공한다.

In accordance with the specifications of the instant contract, the design cost and supervision cost are stipulated as follows:

1.The design cost and supervision cost 1) If the contractor delegates the design to the recipient in common or for convenience, the recipient shall make every effort to select a designer suitable for the design of the nearby and multi-family housing and to rent the rental work. 2) After the preparation of the plan and the preparation of the permit drawing, the contractor shall consult with the modification and fully reflect the opinion of the contractor, so that it may be reviewed three times after the preparation of the detailed construction drawing.

arrow