(영문) 창원지방법원마산지원 2014.06.11 2013가단3265 (1)
토지인도 등
Text

1. From January 1, 2013, the Defendant is on the Plaintiff’s 1,553,649 won and on the 376m2 and D 235m2.

Reasons

1. Basic facts

A. On December 18, 2004, the Defendant completed the registration of ownership transfer in the Defendant with respect to 876 square meters (hereinafter “instant land”) and D 235 square meters (hereinafter “instant 2 land”) in Yongsan-si, Yongsan-gu, Changwon-si, Busan-si, Seoul-si (hereinafter “instant 1”).

B. On July 31, 2007, with respect to the instant land 1 and 2, the registration of the creation of a collateral security (hereinafter “instant collateral security”) and superficies was made under the name of Hyundai Swiss 2 Mutual Savings Bank (hereinafter “instant bank”), and thereafter, upon the instant bank’s application, the Plaintiff was awarded a successful bid for the instant land 1 and 2 and paid the price on September 28, 2012 at a voluntary auction ( Changwon District Court Msan Branch E) commenced for the instant land 1 and 2.

C. Meanwhile, around September 200, the Defendant indicated “attached Form 2” on the instant land, and indicated “attached Form 2” b, c, Ra, f, B, and each point, and indicated “(a)” part of “(i)” part of “(the instant house”) 125.6 square meters,” and “4 square meters of the boiler room of the tank 1,” and “the instant boiler room” (hereinafter “the instant boiler room”; hereinafter “the instant boiler room”) connected in sequence 2, 32.3 square meters of the pipe structure, pipeline structure, pipeline structure, and 2,000 square meters of the instant building (hereinafter “the instant warehouse”) and indicated “the instant 131 square meters of the instant building” as “the instant 131 square meters of the instant building (hereinafter “the instant building”) and indicated “the instant 131 square meters of the instant building”) by using the pipe structure, pipe structure, and 13,000 square meters of the instant building (hereinafter “the instant building”).

[Ground of recognition] Facts without dispute, Gap 1, 4 evidence, Eul 1 through 9, and the purport of the whole pleadings

2. The Plaintiff’s claim is primarily based on the instant house, boiler room, etc.