(영문) 부산지방법원 2015.02.12 2013가단232875
손해배상(산)
Text

1. The Defendant’s KRW 100,324,263 as well as the Plaintiff’s annual rate from March 2, 2012 to February 12, 2015.

Reasons

1. Facts of recognition;

A. The defendant is a person who is engaged in the production and processing business of a prefabricated-type panel, etc. under the trade name of "D" in Busan-gu, Busan-gu, and the plaintiff is a worker employed by the defendant.

B. On March 2, 2012, at around 17:00, the Plaintiff made two studs with E, a workplace partner at the above D workplace, and made two studs “scambling machine” refers to a machine that puts metal or non-metallic materials and processes honds between the lower installment and the ndal. During the studs of the panel, while the steel plate processed using B was cut back to the studs, the steel plate cuts into the studs, and the studs of the studs, and the Plaintiff suffered full injury from both sides, both sides, 2, 3,4,5 resin, pressure damage to both sides, pressure damage to both sides, 2, 3, 4, 45 resin, and 1 part part of both sides, and 1 part of both sides.

(hereinafter referred to as “instant accident”). C.

In this case, the instant grain was operated by the stringr. However, the stringr covered approximately 1.5m from the middle part of the stringr to the end of one end to approximately 1.5m from the middle part of the stringr to the other end. On the other hand, the Plaintiff appeared out of the middle part of the stringr without a cover. At the time of the accident, at the time of the accident, the stringr operated the stringr with the stringr in the middle part of the stringr, and the operation of the stringr was in charge of E.

The instant valley was a structure that was at the risk of cutting a part of the body between a eromatic day and a low installment. There was no device that could prevent or rapidly stop a part of the body at the time of the instant accident from entering the dangerous limit.

E. From the date of the instant accident to December 16, 2012, the Plaintiff received medical care benefits of KRW 10,581,650, temporary layoff benefits of KRW 10,901,650 from the Korea Workers’ Compensation and Welfare Service, and received KRW 14,283,920 as disability benefits.