Text
1.(a)
Defendant E, respectively, 723,434 won, 401,244 won to Plaintiff C, and 1,314,691 won to Plaintiff D.
Reasons
1. Facts of recognition;
A. Each section of exclusive ownership of the plaintiffs, defendant E, F, G, and H are sectional owners who own the ownership equivalent to their share of the site among the land of this case and the site ownership corresponding to their share of the land of this case, which are constructed on the ground of the Seo-gu Incheon, Seo-gu, Incheon, and L (hereinafter referred to as "the combination of the above land") and the land of this case.
On January 23, 1995, Plaintiff A M, Plaintiff B N No. B, Plaintiff B N No. 26.56/328 on January 6, 2008, Plaintiff CO No. 38.17/328 on August 25, 2016, Plaintiff D P No. 46.45/328 on December 46, 2005, Defendant E Q Q Q No. 328 on April 18, 2014, Defendant FR No. 185/328 on April 18, 198, and Defendant B No. 328 on June 16, 198, Defendant CO No. 328 on November 14, 198, and Defendant CO No. 3/328 on August 3, 1988.
B. Of the instant land, the portion connected in sequence 1, 3, 31, 28, 27, 26, 25, 42, 41, 38, 35, 34, 10, 9, 5, 6, and 1 of the separate drawings among the instant land is extended by a single-story asbestos slate building (hereinafter “the instant provisional building”) surrounding the instant building in the form surrounding the instant building.
Defendant F, G, H, I, and netV are owned from January 1, 2009 at the latest, and Defendant E, from April 22, 2014, possession of part of the instant building as indicated below, of the instant land corresponding to the site. Defendant J owned the instant building by inheritance from net V’s children.
In the order of each point of non-owned parts of the building of this case (hereinafter referred to as "part") and non-owned parts of the building of this case (hereinafter referred to as "part") which are connected with each point of the items of 4, 12, 11, 10, 9, 8, 5, and 4 in the attached Form No. 4, 12, 10, 9, 8, 5, and 4, and each point of 12, 13, 14, 15, 16, 16, 17, 18, 11, and 12 on August 31, 2019 with the indication of the removed drawings No. 39, 30, 29, 40, and 39.