logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울남부지방법원 2014.04.10 2013가합10162
정정
Text

1. The defendant,

A. The “SBS News” program initially broadcasted after this judgment became final and conclusive.

Reasons

1. Basic facts

A. 1) The Plaintiff is a company for the purpose of manufacturing and selling railroad-related products, such as Leil, and it is a company that manufactures and supplies Leils, used in the construction of the railway section between Daegu and Busan, which combines the two stages of light-speed rail and the two stages of light-speed rail and the two stages of light-speed rail and the construction of the river section between Hasan and Hasan. 2) The Defendant is a company that aims at broadcasting business and cultural service business, which produces and broadcasts the “SBS News Program” (hereinafter “SBS News”) at 8.0 SBS.

B. The Defendant’s broadcast report and news article 1) The Defendant’s broadcast report with the same content as attached Table 2 (hereinafter “instant broadcast”) as “B” in the news “B” in the SBS 8, which was broadcasted C.

(2) On the same day, the Defendant posted an article (hereinafter “instant article”) of the same content as attached Table 2 on the Internet homepage (www.Sbs.co.kr) operated by the Defendant on the same day, and posted the instant broadcast images to enable users to view them.

[Ground of recognition] Unsatisfy, Gap evidence Nos. 8-1, 2, 3, and Gap evidence Nos. 23, the result of the verification by this court, the purport of the whole pleadings

2. The Plaintiff’s assertion indicated through the instant broadcast and the instant article that ① the second phase of the light-speed rail and the second phase of the concrete line cracks occurred in the entire sections of the subway, and ② the Korea Rail Network Authority had pointed out that it was a matter of trust and did not perform the performance test in the design phase.

However, in fact, ① the crack of the above concrete line was caused by the building-proof phenomenon generally revealed in concrete structures, and according to the joint investigation results on the cause of crack of the above concrete line, the lethroid produced and supplied by the Plaintiff is not the cause of crack.

arrow