logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2015.05.29 2014가단5093012
구상금
Text

1. The Defendant’s KRW 24,250,456 as well as the Plaintiff’s annual rate of 5% from February 28, 2014 to May 29, 2015, and the following.

Reasons

1. Basic facts

A. The Plaintiff is an insurer that entered into an automobile comprehensive insurance contract with respect to the Cgallon vehicle owned by Nonparty B (hereinafter “Plaintiff-owned vehicle”).

B. At around 23:30 on October 11, 2010, the Defendant driven the Defendant’s vehicle Nonparty E (hereinafter “victim”) on the back side of the non-party D-V-125cc Oralian (hereinafter “Defendant’s vehicle”) owned by Nonparty D, driving the Defendant’s vehicle, and, as indicated in the attached drawings, the Defendant shocked the first part of the Plaintiff’s right side part of the vehicle, which was driven by the signal apparatus at the intersection at the speed of approximately 60 km/h from the front of the company bank in the West-dong, Seoan-dong, Seoan-si, as indicated in the attached drawings.

(hereinafter referred to as “instant accident”). C.

At the time of the instant accident, the Plaintiff’s vehicle passed the U.S. internship area in accordance with the U.S. left-hand and right-hand signals permissible for U.S. U.S. U.S., and was a U.S. driver at the location between U.S.

The injured party suffered injury, such as the opening of body in broad bridge boness requiring treatment for about 14 weeks due to the instant accident, and the Plaintiff’s vehicle was damaged to the extent that the repair cost of approximately 1,289,000 won would be required due to the instant accident.

E. On April 5, 2011, the Defendant was subject to a protective disposition issued by the Daejeon Family Court on April 5, 201 (No. 201.349) on the charge of violating the Act on Special Cases concerning the Settlement of Traffic Accidents that caused the instant accident by violating the signal, and B was notified of the payment of a penalty of KRW 60,000 on January 28, 201.

F. The Plaintiff is the insurer of the said comprehensive motor vehicle insurance contract, and is the F Hospital, etc. from December 3, 2010 to February 27, 2014.

arrow