(영문) 수원지방법원여주지원 2016.09.08 2014가단11491
구조물철거 및 주위토지통행권확인
Text

1.(a)

The Defendant-Counterclaim Plaintiff (Counterclaim Defendant) shall make the attached Form 1 drawings out of the land indicated in the attached Table 1 list of real estate.

Reasons

1. The Plaintiff A, B, C, and D, based on the facts, newly constructed three bonds on the ground as the co-owners of the 3,278m2, J-road, the 172m2m2, the 892m2m2, L road, the 193m2, the 446m2, and the 418m2, and the 2m2 m2 in the future.

Plaintiff

E is the owner of the O large 446 square meters and the above-ground housing, and is residing in the above housing.

Plaintiff

F is the owner of Plux 46 square meters and its ground housing, and the F is residing in the relevant housing.

(hereinafter referred to as “land owned by the Plaintiff”). The Defendant is the owner of each road indicated in the separate sheet of real estate adjoining each other, connected to each other.

(hereinafter “Defendant-owned road”. Of them, the roads listed in paragraph (1) of the attached list of real estate owned by the Plaintiffs and the roads owned by the Defendant exist between the land owned by the Plaintiffs and the roads owned by the Defendant, and the above ditches are constructed by connecting the land owned by the Plaintiffs and the roads owned by the Defendant as indicated in the attached table 1 through 4, as shown in the attached table 2. (B) The above ditches have been constructed by connecting them with the land owned by the Defendant as indicated in the attached table 1 through 4 (B), and (4) the above bridges have been newly constructed in the course of the construction of the Plaintiff-owned housing by the Plaintiff-owned, and (3) the bridge was constructed in the said J and L in the course of the construction of the housing by the Plaintiff-owned, and (4) the Plaintiffs have

Around October 2014, the Defendant installed a crypt network, steel pole, steel pole, steel pipe, steel pipe, stone, etc. in attached Form 2, No. 1 to 21, connected to the instant bridge among the instant roads, and accordingly, the Defendant became unable to enter the instant bridge.

The location of the road owned by the defendant, including the land owned by the plaintiffs and the road in this case, is indicated in attached Form 3.

The Plaintiffs, against Defendant G, removed the obstacles set up by the Defendant in the attached Form 2 No. 1 through 21 against the Defendant under the jurisdiction of Suwon District Court 2014Kahap274, and the removal thereof.

arrow