(영문) 인천지방법원 2018.03.21 2016가단233681
손해배상(건)
Text

1. The Defendants are jointly and severally liable to the Plaintiff for KRW 29,941,00 and 5% per annum from April 7, 2016 to March 21, 2018.

Reasons

(a) If any loss is incurred due to cancellation, termination, or breach of a contract, the other party may claim damages;

The comprehensive table of the particulars of the pre-calculated construction cost.

1. Alleys: 96,000,000 won ( approximately 1,370,000 won/70 square meters);

2. Electricity: 7,700,000 won ( approximately 140,000 won/55 square meters);

3. Equipment: 7,700,000 won ( approximately 1,370,000 won/55 square meters).

4. Short heat: 6,400,000 won (based on the short-class grade criteria).

5. Warsaw: 13,00,000 won (in the middle 120m 120m 120m m)

6. Lighting: 12,000,000 won (based on general frequency 11,000).

7. Fishing: 3,000,000 won;

8. Lone Star: 5,500,000 won;

9. Requisition: 17,600,000 won: 4,600,000 won: 12: 3,400,000 won (in addition, 4,000,000 won): 5,600,000 won: 13. Handrails: 14. 1,000 won: 1,50,000 won: 3,500,000 won: 5,000; 16. Parking lots: 5,00,000 won; 16. 5,00,000,000 won; 3,50,000 won; 60,000,000 won for survey, 3,50,000,000 won; 60,000,000 won for additional survey; and 60,000,00 won for additional survey; and

D. Under the instant contract, the Plaintiff deposited a total of KRW 280,000,000 in the Defendant B’s account between October 22, 2015 and April 7, 2016.

On February 2, 2016, when the Defendant continued construction, but at the end of the first completion date, expressed that F would no longer be able to proceed with the construction, and the Plaintiff notified the Defendants of the termination of the instant contract on June 21, 2016.

E. Since then, the Plaintiff paid the additional construction cost of approximately KRW 40 million to Nonparty H, etc., and charged the completion of the instant detached house again, and the construction has been completed at the present time.

[Ground of recognition] A without dispute, Gap evidence Nos. 1 through 5, 7 through 11, appraiser I's appraisal result, the purport of the whole pleadings

2. The parties' assertion

A. The plaintiff's assertion is that of this case against the defendants.