1. The Defendant shall draw up a separate sheet among 800 square meters of forest C in Jeonnam-gun, Jeonnam-gun, the Plaintiff.
1. 표시 ㄱ¹, ㄹ, ㅁ, ㅂ, ㅅ, ㅇ, ㅈ,...
Reasons
1. Facts of recognition;
A. The registration of ownership transfer was completed on June 23, 1995 with respect to the land of 800 square meters of land in Jeonnam-gun, Jeonnam-gun (hereinafter “instant forest”) and on September 22, 2006 in E and F (each of 1/2 shares) respectively.
(A) No. 2-1). (b)
The Plaintiff purchased forest land of this case from E and F on July 30, 2015, and completed the registration of ownership transfer on August 4, 2015.
(A) No. 2-1, c.
The registration of ownership transfer was completed on June 23, 1995 with respect to the G fish farm No. 532 square meters adjacent to the instant land (hereinafter “instant adjacent land”). However, on July 31, 2000, the Defendant purchased the instant adjacent land from D and completed the registration of ownership transfer on August 2, 200.
(A) No. 2-3. D.
On June 26, 200, the Defendant reported to the Do governor on June 26, 200 that he will construct a fish farm building of the total floor area of 465 square meters on one parcel, other than the neighboring land of this case, until June 25, 2010 for the retention period. At that time, the Defendant constructed and owns a cement block block structure and fish farm building (hereinafter “the fish farm of this case”) on the adjacent land of this case (the fact that there is no dispute, the result of inquiry about the Nam-gun, and the result of inquiry about the fish farm of this case). The annexed drawings
1. 표시 ㄱ¹, ㄹ, ㅁ, ㅂ, ㅅ, ㅇ, ㅈ, ㄱ¹의 각 점을 차례로 연결한 선내 (나) 부분[이하 ‘(나) 부분‘이라 한다] 위에 이 사건 양어장 건물 중 일부가 있고, 같은 도면 표시 ① 부분에 이 사건 양어장 부속시설인 피고 소유의 급수탱크 1동 4㎡가, 같은 도면 표시 ② 부분에 이 사건 양어장 부속시설인 피고 소유의 급수탱크 1동 2㎡(이하 위 급수탱크 2개동을 ’이 사건 급수탱크‘라 한다)가 있다
(As a result of on-site verification, results of commission of surveying and appraisal to the Korea Land Information Corporation)
On January 2, 2009, the defendant filed a report on the construction of a temporary building for the retention period of the fish farm of this case to the Gun of South-Nam-do on July 17, 2018.
(2) No. 1 of this title.