(영문) 대전지방법원 2018.11.01 2017가단213927
건물명도(인도)
Text

1. The plaintiff A:

A. Defendant C’s KRW 9,720,00 and its amount shall be 5% per annum from July 4, 2017 to November 1, 2018.

Reasons

1. Basic facts

A. The plaintiff A is the owner of each land listed in the separate sheet 1 through 5 and each building listed in the separate sheet 7 and 8, and the plaintiff B is the owner of the land listed in the separate sheet 6.

B. On April 10, 208, the Plaintiff divided the land indicated in the attached Table 1 through (3) and the land indicated in the attached Table 1 into H field 12 square meters to Defendant C on April 10, 2008, the land category of which was changed to the warehouse site on March 5, 2009. The land indicated in the attached Table 1 was divided into G before subdivision; hereinafter the same shall apply) and the first return 38 square meters (divided into the land listed in the attached Tables 4 and 5 on September 30, 2008), among the land listed in the attached Table 6, 1,322 square meters ( around 400 square meters) from the land listed in the attached Table 1 to April 30, 2013, the Plaintiff leased the land to Defendant C with the rental permit under the attached Table 1,322 square meters on condition that it was leased to Defendant C, 10% on May 1, 2008 through April 30, 201013.

C. After that, around August 2008, Plaintiff A leased the remainder of each of the lands listed in the paragraph (b) to Defendant C.

(hereinafter referred to as "the instant lease agreement" between the plaintiff A and the defendant C.

Defendant C obtained a building permit under the Plaintiff’s name on the land leased as above, and obtained the approval for the use of the building listed in the attached Table 8 on September 11, 2008, and obtained the approval for the use of the building listed in the attached Table 7 around February 26, 2009.

E. However, Defendant C, around September 2008, shall draw up a separate sheet among the first floor of the buildings listed in Annex B(8) of the attached Table to Defendant E.

2. 표시 ㄱ, ㄴ, ㄷ, ㄹ, ㄱ의 각 점을 순차로 연결한 선내 ㈎부분 60.86㎡(이하 이 사건 점포1이라고 한다)를 전대차기간 2008. 9. 1.부터 2013. 8. 31.까지, 전대차보증금 5,000,000원, 전차임 월 500,000원으로 정하여 전대하여 피고 E이 그 무렵부터 이 사건 점포1을 점유하여...