(영문) 서울서부지방법원 2020.02.07 2019가단219987
건물등철거
Text

1. The defendant is against the plaintiffs:

A. Of the area of 374.4 square meters in Mapo-gu Seoul Metropolitan Government, the attached map Nos. 14, 15, 16, 17, 18, 19, 20, 21.

Reasons

1. Facts of recognition;

A. 1) Seoul Mapo-gu Seoul Fdong (hereinafter “Fdong”) owned by E Co., Ltd.

(2) On January 16, 2017, with respect to G 282.6 square meters, the registration of transfer of ownership was completed on the ground of sale on August 17, 2015 in the name of H (7/10 shares) and I (3/10 shares). As to D 91.8 square meters, the registration of transfer of ownership was completed on the ground of sale on August 17, 2015 in the name of H (7/10 shares) and I (3/10 shares). (2) G 282.6 square meters and D 91.8 square meters, each of which was registered on July 10, 2018 in the name of the Plaintiffs on July 10, 2018.

3) As a result of the combination of G large 282.6 square meters into D large 91.8 square meters after D large 91.8 square meters, D large 374.4 square meters (hereinafter “Plaintiffs’ land”).

B. B. A. B. D. D. M. J. 11.7 square meters adjacent to G 282.6 square meters prior to the annexation (hereinafter “Defendant’s land”).

(2) The Defendant’s building (hereinafter “Defendant’s building”) is 35.17 square meters of 1st, 64.56 square meters of 2nd, 2nd, 64.56 square meters of 3rd, 59.91 square meters of 3rd and upper floors, and 35.17 square meters of 3rd and upper floors of 2nd,

On December 23, 1995, the registration of transfer of ownership was completed on October 29, 195 under the name of the Defendant for sale and purchase. C. Part of the Defendant’s building connects each of the items of the Plaintiffs’ land to the following in sequence: 12, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 8, 9, 10, 11, and 12, and part of 18.3 square meters in a ship (hereinafter referred to as “part (b)”).

[Attachment 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 8, 9, 10, 11, 30, and 14 of [Attachment 14, 15, 15, 16, 17, 18, 20, 22, 23, 24, 26, 27, 29, 29, 29, 10, 11, 30,

hereinafter referred to as “the dispute part of this case”

[The above] The fence of the Defendant building and the provisional building are located, and the part of the ship (c) part 0.8 square meters (hereinafter referred to as "c) connected in sequence with each point of the attached drawings 12, 14, 30, 11, and 12 shall be 0.8 square meters (hereinafter referred to as "c).

The main body is located in the defendant's building. D.

H and I shall on January 2, 2020.