logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울행정법원 2017.12.14 2016구합79779
도시계획시설(도로)사업 실시계획취소청구
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

The details and details of the disposition A is the owner of the real estate listed in the list Nos. 1, 2, and 3, and the Plaintiff B is the owner of the real estate listed in the same list.

(hereinafter referred to as “each of the instant real estate” as indicated in the list (attached Form 1). On June 21, 2002, the Seoul Special Metropolitan City Mayor publicly notified D on June 21, 2002, the Yeongdeungpo-gu Seoul Metropolitan Government E-Japan 69,350 square meters (hereinafter “instant project district”) was determined and publicly notified as a district unit planning zone.

The contents of the [Attachment 2] Table 1 and [Attachment Form 1] are included in the establishment of three categories of small-ro (large 6m, length 26m) from Yeongdeungpo-gu Seoul Metropolitan Government to H, as shown in paragraph (1).

(hereinafter “instant district unit planning decision”). On November 29, 2007, the Mayor of the Seoul Metropolitan Government determined and publicly announced the K Urban Renewal Promotion Plan, which determines the size of 1,469,910 square meters as K urban renewal acceleration district, including the instant project district, as I publicly notified on November 29, 2007.

The contents of [Attachment 2] List 2 and [Attached Form 2] List 3 are changed from Yeongdeungpo-gu Seoul Metropolitan Government to L (breadth 6-8m, length 110m) and include the opening of 3-3 (breadth 12m, length 280m, length 280m; hereinafter referred to as “China 3-3”) among M through N, and the above two roads are located within the 15 areas of the K Urban Renewal Promotion Plan.

(hereinafter “Determination of the instant urban renewal acceleration plan”). On August 27, 2015, the Seoul Special Metropolitan City Mayor decided to change the project area of the instant urban renewal acceleration zone to the content of reducing (36,635 square meters) the project area of the instant urban renewal acceleration zone (32,234 square meters) among the determination of the instant urban renewal acceleration plan.

As a result, some sections of 3-3 were changed in length and width, and part of the site excluded from the site excluded from the OAB promotion zone among Class 3 (hereinafter “Sero 3”), and Category 3, as the instant district unit planning was returned from Yeongdeungpo-gu Seoul Metropolitan Government to H (breadth 6m, length 26m) as the instant district unit planning was determined.

hereinafter referred to as "the alteration of the renewal acceleration plan of this case".

arrow