(영문) 대전지방법원 2015.12.29 2013가단216065
구상금
Text

1. The Defendant’s KRW 35,164,567 as well as the Plaintiff’s annual rate from June 29, 2012 to December 29, 2015.

Reasons

1. Basic facts

A. Status 1) The Plaintiff is the Industrial Accident Compensation Insurance Act (hereinafter “Industrial Accident Compensation Insurance Act”) and the Industrial Accident Compensation Insurance Act

A) Accordingly, a special corporation is established to promptly and fairly compensate for any occupational accident of workers by being entrusted with the industrial accident compensation insurance business by the Minister of Employment and Labor. 2) The Defendant is engaged in mid-term contracting and lending business with the trade name of “B” and owns C Excavation Trackers (hereinafter “instant digging Trackers”) and was driving at the time of the following accident.

3) D is engaged in a bed business with the trade name of “E” and is a person who has purchased industrial accident compensation insurance under the Industrial Accident Insurance Act between the Plaintiff and the Plaintiff (hereinafter “business owner”).

F) As an employee of an employer, F is an employee of an employer who was injured due to the following accidents (hereinafter referred to as “victim”).

B. B. The Defendant entered into a lease agreement with the business owner on the searcher of the instant case and carried out a set of trees at the H construction site located in Seosan-si, Seosan-si, with the victims, which are likely to walk in electric wires, etc.

2) While the Defendant driving the instant digging machine and cutting the bottom of the trees with machine saws, the sprinks cut the spacks of trees, and the Defendant again cut the spacks of trees with machine saws in such a way that the sprinks used to collect and transport the trees on the floor by cutting them again, and then cutting them on the vehicles for transporting the spacks. 3) On October 5, 2010, at around 08:30, at the time of October 20, 2010, the Defendant applied the spacks of trees to the electric wires over the spacks machine, while the spacks cut the bottom with machine saws, but the spacks came to be used in the direction of cutting trees as spacks by mislead the operation of the spacks machine, and the space for escape has not been secured in advance.