logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2017.12.13 2017가단110574
손해배상(기)
Text

1. From July 10, 2017 to December 13, 2017, the Defendant: (a) KRW 23,306,132 to the Plaintiff Green Art Co., Ltd. and its amount.

Reasons

1. The occurrence of an accident ① The Plaintiff purchased dump truck B 25.5 tons of a dump truck (the length shall be 9.015m, 2.495mm, 13,840mg, 540m, 540m, and 12m, in total, 12 p.m., 13,840m, 540 p.m., and 4m.). The Plaintiff Company entered the Plaintiff Company’s name and completed the ownership transfer registration, and directly operated and operated it until now (the Plaintiff Company operates the Plaintiff Company C). ② The Plaintiff Company: (a) loaded the scrap iron of 24,760kgg of the above truck from July 10, 2017 to the east-ri on the east-ri side of Kimhae-si, and (b) moved it from Kim Jong-ri, Kim Jong-ri.

The E-Road in the above road, Kimhae-si, was passing through the front road, and the steel lids located on the above road are divided into the pressure of the truck, and it is installed at the lower part of the truck cover (e.g., liquid cover,ax housing), and the fish tank for brakes, straw, etc. (e.g., high-speed 3 axiss were severely damaged following the driver's seat). The vehicle's condition is impossible to operate, and its repair is required to be 46,612,264 won (including value-added tax) at its cost. ③ The above road is constructed and managed by the defendant, and it is 3 meters wide from the front part of the road, which is installed at the center of the direction of the truck, and immediately after it is marked by a white lid, it is installed at the front part of the road, and the vehicle's height and the first part of the vehicle's height had been damaged by the vehicle's diameter from the front part of the road.

arrow