Text
1. The insurance money of the Plaintiff (Counterclaim Defendant) as to the damages incurred by the Defendant (Counterclaim Plaintiff) in relation to the accidents listed in the attached list.
Reasons
A principal lawsuit and a counterclaim shall be deemed simultaneously.
1. Facts of recognition;
A. B subscribed to the sales liability insurance (hereinafter “instant insurance”) with the following content as the Plaintiff:
Contractor B: Insured Type B: An insured incident to be compensated by the Company in accordance with Article 1 (accident) of the Special Terms and Conditions of a Facility Owner: The term "insured incident to be compensated by the Company" means an accident resulting from the performance of duties in accordance with the use of the facility owned, used or managed by the Insured (Subject to Insurance) and the facility.
Insurance period: from June 8, 201 to June 8, 2012: 10,000,000 won for insurance coverage for liability for damages.
B. At around 16:00 on May 19, 2012, the Defendant lent four bicycle riders at a bicycle rental shop operated by B (hereinafter “instant bicycle”).
The bicycle of this case was leased in the state of being exposed to the upper direction by the hacker with the upper right cover without the front wheels cover.
C The instant accident was caused by the instant accident where C, while driving the instant bicycle while driving the wheel, was faced with a tree in order to stop driving stand on the right side because it did not stop, and the Defendant was seated with a tree to stop driving the bicycle on the right side, and was faced with the left side bridge on the front side of the bicycle, and was faced with the instant accident.
C. The instant bicycle was of a structure in which a driver who sits on the back side operates a motor vehicle, and gets enormously from the driver’s seat, thereby getting down the hacker’s hacks and wheeling with the wheels.
At the time of borrowing bicycles, the defendant and C did not hear a proper explanation about the operation method.
On May 20, 2012 immediately after the instant accident, the Defendant has performed an operation, such as creative washing, with respect to the ground for pulverization of the senior executives of the fladsium.