A defendant shall be punished by imprisonment for not less than eight months.
However, the execution of the above sentence shall be suspended for a period of two years from the date this judgment becomes final and conclusive.
Reasons
Punishment of the crime
Since May 23, 2006, the Defendant, as the actual representative of E in the Gyeongbuk-gun, performed the function of goods supply contract, from around May 23, 2006, to the victim G, the representative director of F Co., Ltd. (hereinafter “victim Co., Ltd.”), a company (hereinafter “victim Co., Ltd.”) under the goods supply contract, produced the steering gear and suspender (which is a device with a function to absorb shocks directly and directly to the body or passengers, and which has a function to absorb shocks from the surface) among the parts of the automobile to be used in SWCH45F located in SWCH45F, to be seen as not being able to be able to freely change the direction of the gate, to be able to work on the upper part, and to be able to be able to be able to work on the upper part, and to be able to be able to be able to be able to be able to be able to be able to be able to be able to be able to be able to be able to be able to be able to be able to be produced.
On August 29, 2013, the Defendant supplied material managers 1,775.58km at the lower end of the Victim Company H located in Seogu-gu, Daegu-gu, as if the Defendant supplied material managers 1,775.58kg’s standard price per kg as if the Defendant supplied SWCH45F’s standard price.
However, in fact, the posters supplied as above were posters located in S45C located in S45C with the unit price of KRW 1,180 per kg.
As such, the Defendant, by deceiving a person in charge of the material of the victim company, supplied the material room located in S45C in the same manner from the above date to March 29, 2017, providing the material room in S45C with the material room that is produced by the material manager at low unit price via sampling, as seen above, in addition to acquiring the pecuniary benefits of KRW 301,849 [=1,75.58kg x (1,350 won - 1,180%) by means of sampling, and supplying the material room at low unit price to the person in charge of the material manager.