logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2020.01.15 2019나313112
약정금
Text

1. The plaintiff's appeal against the defendants is dismissed in entirety.

2. The costs of appeal shall be borne by the Plaintiff.

purport, purport, and.

Reasons

1. Basic facts

A. On October 2015, Defendant C Co., Ltd (hereinafter “Defendant Co., Ltd”) received a subcontract from D Co., Ltd. (hereinafter “D”) for part of E gas pipeline construction work (hereinafter “instant construction work”) and entered into the construction work from around that time to November 2017. Defendant B was the head of the Defendant Co., Ltd’s site office at that time.

B. The U.S. residents of the Cheong-do North Cheong-do filed a civil petition that would impede their livelihood due to vehicle control, scattering dust, etc. caused by the instant construction works, and the “Fri-Do Counterterrorism Committee” was established, and the Plaintiff was elected as the chairman.

C. Around April 2016, the Plaintiff drawn up an explanatory note with Defendant B (hereinafter “instant text”) as follows.

E The Director B of the On-Site Co., Ltd. (hereinafter referred to as the "A") and the Chairman of the Frith Countermeasure Committee (hereinafter referred to as the "B") shall agree to actively respond to the matters requested to "B".

"B" means the matters required to "B" (1) the extension of the second floor (within about 20 square meters) for the Fri community hall (within 20 square meters) (2) the part toilet for the second floor extension (one waluri, one waluri, one simple shower) (3) the last 2, television 42, and one air-conditioner for the interior of the building (one cambling point), and the latter part of the main text of the article of the special article of cash for the village creation (a sum of KRW 3,00,00) for the implementation of a normal construction project in conformity with the construction regulations, rules, etc., in connection with the construction project, "B" does not make a civil petition or additional request for any one for any reason, such as "A", and this letter shall be null and void, and "A" shall be responsible for the affirmatively ordering the requirements of "B" and shall be responsible for it.

The Chairperson of the AFrith Countermeasures against the Director of the Field B, each of whom;

D. The plaintiff is the chairperson of the Frith Countermeasures Committee.

arrow