logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 상주지원 2018.02.06 2017고단409
폐기물관리법위반
Text

A defendant shall be punished by imprisonment for not less than two years and six months.

Reasons

Punishment of the crime

.2017 Highest 409, 2017 Highest 409, the Defendant, along with C and D members of the waste speculation organization, is a person in charge of the management of the waste discharge sources, waste disposal places, waste transport vehicles, etc., with the overall management of the waste discharge places, waste transport vehicles, etc., to inform vehicle engineers of the waste disposal places and waste disposal places and instruct speculation.

In addition, E is a person in charge of the role of physical and lease contract, F, G, and H as an engineer of each waste transport vehicle, and I as an intermediary for vehicle articles.

No person who intends to engage in the business of collecting, transporting, recycling, or disposing of wastes at any place or facility, other than those prepared by a Special Self-Governing City Mayor, a branch office of a Special Self-Governing Province, the head of a Si/Gun/Gu, or a park, road, etc. to collect wastes, and any person who intends to engage in the business of collecting, transporting, recycling, or disposing of wastes shall obtain permission from the Minister of Environment, if he/she intends to target designated wastes by type of business, wastes subject to

[Detailed Criminal Facts]

1. From February 27, 2017 to March 19, 2017, the Defendant: (a) installed in K prior to K, 5,978 square meters on the land leased by J; (b) installed both iron plates with a height of 3 meters and 3 meters above the upper end of 5,978 square meters; (c) indicated on the wall “L Temporary red site M” on the wall as if he/she was a temporary site for construction materials; and (d) conducted a disguised act as if he/she were a temporary site for construction materials; and (c) under C, the remaining period from March 6, 2017 to March 15, 2017, the Defendant directed the Defendant directly, and ordered the C to throw away approximately 320 tons of waste from the place of business, such as waste water, waste fish net, waste waste, etc.; and (d) had a cancer vehicle engineer throw away waste from the above place of business on the land.

In this respect, the defendant C, E, and

arrow