Text
1. Defendant C:
A. Attached Form 1, No. 1, is marked to the Plaintiff (Appointed) and the Appointors, among the area of 446 square meters in the Gu-U.S. E-si.
Reasons
1. Basic facts
A. On November 30, 2005, the registration of ownership transfer was completed in the JJ on November 30, 2005 with respect to the Gu-U.S. K large 434 square meters (hereinafter “instant K”), and on February 6, 2012, the registration of ownership transfer was completed in the name of his/her birth, B, which was his/her birth, and on August 21, 2018, the registration of ownership transfer was completed again in the name of the Appointed J on August 21, 2018.
Housing and warehouse exist on the ground of the K-land of this case.
B. With respect to the land of the Gu, the Gu, the Gu, the 452 square meters (hereinafter “instant L”) and the housing of 42.81 square meters on the land of the instant L, the ownership transfer registration was completed on March 16, 2004, respectively.
M was deceased on January 27, 2019, and G, H, and I jointly succeeded to the above M.
C. On October 31, 2007, the Plaintiff’s ownership transfer registration was completed on October 31, 2007 with respect to the housing of 34.78 square meters and 20.99 square meters in both the housing of 34.78 square meters and the soil of splate roof on the ground of the instant N-land and the land of the instant N-land.
On September 29, 1980, the registration of ownership transfer was completed in Defendant C on September 29, 1980 with respect to the 446 square meters in Gumi-si.
E. As to the F-si F-si 105 square meters and O-416 square meters, on January 29, 2007, the registration of ownership transfer was completed on the Defendant D on January 29, 2007, and the F-si F-si land was merged on March 19, 2018 and became F-W-521 square meters.
F. The location of each of the above lands is as listed in the annexed Form 1.
G. On each land of this case K, L, and N, among the land of this case, the part (b) (a) connected with each point of the attached Table 1, 2, 3, 4, 5, 8, and 1 in the order of priority among the items in attached Table 1, 2, 3, 4, 5, 8, and 1 in the Gu, Si, Si, si and Gu, and the part (a) connected with each point of the attached Table 13, 20, 21, 22, 23, 24, 7, 8, 9, 10, 11, 12, and 13 in the order of priority among the land of this case and the part (a) connected each point of the attached Table 2 with each point of the attached Table 1, 2, 3, 4, 5, 8, and 521 square meters in the road of this case (hereinafter “the road of this case”). The land of this case can only pass through P, M, and J.