(영문) 대전지방법원 2018.04.11 2017가합104105
계약금반환 등
Text

1. The Defendant’s KRW 220,580,760 as well as the Plaintiff’s annual 6% from July 20, 2017 to April 11, 2018, and the following.

Reasons

1. Basic facts

A. The Plaintiff of the parties, etc. is an autonomous management body organized by their occupants to manage Seo-gu Daejeon Apartment (hereinafter “instant apartment”), and B was a person who was in charge of the Plaintiff’s representative from October 2015 to April 2017, and the Defendant is a corporation established for the purpose of mechanical facility construction business.

B. 1) The Plaintiff’s written consent from May 11, 2015 to the following contents (hereinafter “instant written consent”) is promoted to convert the heating supply method of the instant apartment from the central heating to the individual heating.

I agreed to the conversion of individual heating. 1. 2. I agree to the disuse and removal of unnecessary central heating facilities. 3. I agree to the incorporation and adjustment of the cost of the new installation of gas pipes and the cost of the installation of the facility contributions into the long-term repair plan. 2) On March 28, 2016, the Plaintiff entered into a contract for the design service of the individual heating system with the Geum River Facility ENG (hereinafter referred to as “gold River Equipment”) on March 28, 2016.

3. On April 24, 2016, the Plaintiff held a design report and a resident presentation meeting to explain the method of individual heating conversion works and the installation of individual heating in households against sectional owners.

In relation to the method of the above construction, ① the method of replacing the installation pipelines installed on the corridor with the major pipelines connected to each household's main pipelines, and ② the method of connecting the installation of heating pipes to the boiler installed on the benda, with the existing installation of heating pipes on the benda external wall. ② The method of connecting the installation of heating pipes to the boiler installed on the benda. ① The method of the construction was raised to the point that the pipes connected to the benda to the benda where the boiler is installed through the benda, so it is not good in view of the aesthetic sense.