logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2015.06.03 2014가합34909
소유권확인등
Text

1. Of the instant lawsuits, each of the instant lawsuits against Defendant B and Defendant International Asset Trust Co., Ltd.

Reasons

1. Basic facts

A. The Plaintiff is an agent contract, loan contract, and trust contract 1) the total area of 4,316.80 square meters owned by the Plaintiff, which is the sum of 4,316.80 square meters (hereinafter “instant land”).

2) Mixed buildings (hereinafter “instant building”) consisting of accommodation, sales, culture, and assembly facilities on the ground and 5th basements and 42th above ground.

2) The project to newly build and sell the project (hereinafter referred to as “instant project”).

on August 27, 2007, gold and mineral business corporation (hereinafter referred to as “gold and mineral business”)

As to the construction work of this case, the contract for the construction work of this case is set at KRW 82,026,00,000 (excluding value-added tax) and the construction permission was obtained from the head of Busan Metropolitan City on November 8, 2007, and then the construction permission was obtained from the head of Busan Metropolitan City on August 7, 2008 and the Asian Trust Co., Ltd. (the trade name before the modification: the Asian Asset Trust Co., Ltd.; hereinafter referred to as the “ Asian Trust”).

The Bank, a lender, is the Bank of Korea (hereinafter referred to as the "Bank").

On April 1, 2010, the Dongyang Asset Management Co., Ltd. (the trade name before the change was changed) and the asset management company (the company before the change was changed to the above trade name).

The term "Dongyang Asset Management" is hereinafter, and in the case of a common name with the Industrial Bank of Korea, the term "the lender of this case" is hereinafter.

between the corporation and the corporation (hereinafter referred to as the “instant agency contract”) and the agency service contract.

The purpose of this Agreement is to clarify the scope of and responsibilities for the project under the laws on sale of buildings, and to efficiently manage trust property and proceeds from sale, thereby protecting buyers and smoothly carrying out the project. Article 2 (Opening of the Project) The purpose of this Agreement is to clarify the scope of and responsibilities for the project between the plaintiff, gold ore enterprise, Asian Trust and Industrial Bank of Korea and the same Yangyang Asset Management.

7. Period: forty months from the date of first withdrawal of the loan.

arrow