(영문) 부산지방법원동부지원 2016.05.13 2014가합2401
건축사용승인 등
Text

1. The Defendant’s KRW 7,168,00 for the Plaintiff and KRW 5% per annum from August 15, 2014 to May 13, 2016.

Reasons

1. Facts of recognition;

A. On August 11, 2002, the Plaintiff and the Defendant, the Plaintiff owned, removed a house on the ground located in the Nam-gu Busan metropolitan area of 185 square meters (hereinafter “instant land”), and entered into the following contracts (hereinafter “instant contract”) with the content that constructs multi-household housing on the said land:

A project owner: The Plaintiff (hereinafter referred to as “A”) and the contractor: The Defendant (hereinafter referred to as “B”).

1. Site location: Busan Southern-gu C (56 square meters);

2. Terms and Conditions 1) A of the instant site: (a) A of the three-story multi-household housing units newly built on the said site; and (b) “B” of the two-story (2 household units) after the completion of construction shall transfer ownership to “B”; and (c) “B” shall pay the remainder of the two-story (4 household units) to “B” as construction cost. (b) The current site’s financial right security loan shall be transferred to a housing bank and the interest on the financial interest until the construction monitoring is completed and borne by “B” after completion.

3) The repayment of the deposit money for the lease on a deposit basis of the current tenant shall be made at the time of moving the tenant, and the relocation shall be completed by September 15, 2002 ( approximately KRW 40 million for the loan of the loan of the money for the lease on a deposit basis for an existing tenant) and the monthly rent shall be determined after consultation with the contractor.

5) The construction period shall be approximately three months after the commencement of the construction period. 6) The removal costs and all other expenses for the measurement shall be borne by “B”.

7) Matters not indicated above are customary. B. The Defendant requested the Plaintiff to transfer ownership of part of the instant land in the name of the Plaintiff, other than the Plaintiff, in order to obtain a loan from a financial institution. The Plaintiff, upon the said request, filed a transfer registration of ownership in the name of each owner of the instant land, as described below Nos. 1 through 5 (the owners of the instant land were Plaintiff D, and the remaining owners are the parties related to the Defendant, such as the Defendant’s wife.

A. On September 7, 2002, partial trade E 21,850 on September 2002, 200, the owner of the title 1,850,000 as the date of registration of the ownership ownership registration.