Defendant shall be punished by a fine of KRW 1,000,000.
If the defendant does not pay the above fine, 50,000 won.
Reasons
Punishment of the crime
[Basic Facts] Around August 27, 2010, the Defendant entered into a construction contract with E and Chungcheongbuk-gu Office for the construction work of newly building one bond from the (ju) D office in the operation of the Defendant located in Heung-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu., to the Fil-gun, Chungcheongnam-do, and made two copies of the same contract and divided them into E and one, respectively.
The above contract is composed of “the terms and conditions of construction contract” and “the terms and conditions of construction contract”. The Defendant and E entered “B million won (60,000,000 won),” “E” in the construction contractor column in the construction contractor column in the construction contractor column in the construction contract column in the column in paragraph 4. Of the “the terms and conditions of construction contract”, the Defendant and E entered “B million won (60,000,000 won),” “E” in the construction contractor column in the construction contract section in the construction contract section in the column in paragraph 7.8 (8). Of the “the terms and conditions of construction contract”, the Defendant and E entered KRW 19,00,000,000 in the form of “the amount of 30,000,000 won” and “the amount of 19,000,000 won” in the middle column in the form of contract.
However, the remainder of KRW 19,00,000 as stated in the above terms and conditions of construction contract includes KRW 10,000,000 for the remainder of the construction cost of electric power resource housing, and the amount of KRW 9,00,000 for additional construction cost under Article 8. 8. The actual construction cost for electric power resource housing itself was KRW 60,000.
【Criminal Facts】
On November 201, 201, the Defendant, without authority, had one of the above contracts entered into with E at Cheongju-si, Cheongju-si, as seen above, with the intent of exercising its authority. In the construction cost column of 4. Paragraph (4) of the “the terms of construction contract” in the “the terms of construction contract,” deleted the “man’s million won” from among the parts in the “the terms of construction contract,” and subsequently stated the “man’s million won” additionally, and changed the above contract with the Defendant’s seal affixed thereon.
After that, the defendant changed the contract to an employee who is not aware of such fact at the public service center of the Cheongju District Court located in the same Siung-dong, Chungcheongnam-gu.