logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 서부지원 2018.08.16 2017가단12350
토지인도등
Text

1. The Defendant shall, in order to the Plaintiff, each point indicated in the attached Form 1 through 17, and 1 among the area of 430 square meters in Gyeong-gun, Seongbuk-gun, Seongbuk-do.

Reasons

1. Facts of recognition;

A. On June 23, 2016, the Plaintiff is a building owner of a building with a 430 square meters wide-area in Seongbuk-gun, Seongbuk-gun, Sung-gun, and ordered the Defendant to perform the structural construction of the above building.

B. While performing the above structural construction, the Defendant waived the construction, and there remain spawres, copper, and rain pipes as stated in the order installed by the Defendant at the construction site.

[Ground of recognition] A without dispute, entry of evidence No. 1, purport of the whole pleadings

2. According to the above facts of recognition, the defendant is obligated to collect each of the diversities, dongba, and non-form pipes as indicated in the disposition and deliver the building and land as indicated in the order to the plaintiff.

Therefore, the plaintiff's claim is reasonable, and it is decided as per Disposition.

arrow