Text
1. The Defendant’s KRW 53,844,684 as well as the Plaintiff’s annual rate from February 3, 2015 to September 9, 2016.
Reasons
1. Basic facts
A. The Plaintiff as a party (former trade name: ELA Property Insurance Co., Ltd.) is an insurer who has concluded a comprehensive automobile insurance contract with the said company with respect to the B Blue vehicle owned by the said company (hereinafter “instant vehicle”).
The defendant is a local government that manages the road at the place where an accident occurred as follows:
B. On March 23, 2011, C driving the instant vehicle at around 11:23, and driving the instant vehicle at a two-lane from the main road in the main road in the Gwangju Mine-dong (hereinafter “instant road”), and driving the two-lane of the main road in the main road in the Gwangju Mine-dong (hereinafter “instant road”), the said part of the front wheels of the DNA driving tank driving the same one-lane on the right side of the instant vehicle was shocked in front of the left side of the instant vehicle, and then the two-lanes of the instant road, which are cut down under the right side of the road.
However, at the time, the part of the above protective fence was connected to the front glass of the vehicle of this case, and as a result, A, who was on board the Chief Lighting of the vehicle of this case, suffered serious injury, such as a non-alley, a ductal, a ductal, and a ductal cutting of the right part.
C. (hereinafter “instant accident”). C.
1) A and his parents, E, and F filed a lawsuit against the Defendant seeking damages arising from the instant accident (hereinafter “relevant damages lawsuit”) by the Gwangju District Court 2012Kadan65350 (hereinafter “instant damages lawsuit”).
(2) On October 30, 2013, the above court rendered a judgment that "the defendant (the plaintiff in this case) shall pay to the plaintiff 171,744,681, and to the plaintiff E and F 2,50,000 won each and each of them shall be 5% per annum from March 23, 2011 to October 30, 2013, and 20% per annum from the next day to the date of full payment." (2) On November 19, 2013, the plaintiff shall pay to the plaintiff 171,744,681, and to the plaintiff E and F 2,500 won each, and shall be 5% per annum from the next day to the date of full payment.