logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2017.01.20 2015가단64045
대여금
Text

1. The Defendant (Counterclaim Plaintiff) shall pay to the Plaintiff (Counterclaim Defendant) KRW 93,389,608 and its full payment from September 22, 2015.

Reasons

1. Determination as to the cause of the principal claim

A. Basic facts 1) The Plaintiff, along with C, D, and E, was newly built by F on September 201, approximately KRW 620 square meters in total, approximately 1,240 square meters in the Gangseo-gu Busan Metropolitan Government Building on the ground of KRW 2,240 square meters in G (hereinafter “instant building”).

(2) On October 1, 201, the building of this case was leased from F to F in its own name with a rental deposit of KRW 120 million and monthly rent of KRW 12 million. 2) After that, the Plaintiff and C, etc. classified the building of this case into each part of the building of this case and borne by the Plaintiff, in each part of the building of this case, with a golf flow point, C and C, with a monthly rent of KRW 12 million and management expenses, respectively, while operating a grops point, and E was in charge of the duties to receive and manage the building of this case at the time, according to the ratio of the area of each user’s use of the monthly rent of KRW 106 and 107 of the building of this case (hereinafter “instant 106 and 107”).

3) While the Plaintiff was preparing for the operation of the camping point in this case under 106 and 107, the Plaintiff was introduced by H that operated the Aging and camping point at Changwon around October 2012. 4) In order to operate the camping point, the original Defendant entered the name of the Plaintiff and lessee in the name of the Plaintiff and lessee in the name of KRW 30 million, monthly rent of KRW 3 million (3.3 million per month if the value-added tax is included in the rent of KRW 200,000,000,000,000,000 won (including value-added tax), and the said rent of KRW 200,000,000,000,000,000 won, including the above rent of KRW 20,000,000,000,000,000 won per month from December 2, 2012 to September 10, 202.

arrow