(영문) 서울중앙지방법원 2016.12.07 2015가단5177412
손해배상(기)
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On May 18, 2005, G (K: H) used 197 square meters in Gangwon-do and 326 square meters in its possession for five years, and (326 square meters in its possession, and agreed to gratuitously transfer a building with the above JJ large 197 square meters in its own land for five years after the construction of a pentation building on each of the above grounds to I, and then to gratuitously transfer the building with the above K large 197 square meters in 326 square meters in 19 on December 19 of the same month to 300 square meters in 326 square meters in 19.76 square meters in 19.76 square meters in 20 square meters in 19.6 square meters in 30 square meters in 20,000 in 20,0000 won in 30,000 won in 20,0000 won in 20,0000 adjacent to 197,000 square meters in 20.

B. On December 9, 2005, G filed an application for the occupation and use permission for housing marina to use the 192 square meters (hereinafter “the instant river site”) out of the 210,218 square meters of Gangwon-do river owned by the Republic of Korea prior to the instant pention and adjacent pention (hereinafter “the instant river site”). At that time, G obtained the occupation and use permission for the instant river site from the F head of F Gun. Since then, M created and used a wooden floor (hereinafter “the instant river site”) for the operation of pention in the instant river site.

C. G was divorced from M in around 2007, and on March 27, 2010, sold to the Plaintiff the Gangwon K 326 square meters in size, L 69 square meters in size, and the pentine in this case, and then sold the same year to the Plaintiff.

4. On 16. 16. The Plaintiff completed the registration of ownership transfer, and the Plaintiff was running the lodging business in the instant pension.

On the other hand, on November 23, 2010, M submitted a report on the succession of rights and obligations (No. 7) to acquire the permission to occupy and use the river site in this case.