(영문) 서울고등법원 2019.05.03 2018나2027261
물품대금
Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

The purport of the claim and appeal is the purport of the appeal.

Reasons

1. Basic facts

A. The Plaintiff is a corporation that runs the manufacturing business of automation machinery and tools and wholesale and retail business, and the Defendant is a corporation that runs the manufacturing business of precision, electricity and machinery parts.

Article 1:Contract Amount: Article 2 of the RoGV LINE 370,00,000 Won 370,000,000 on February 28, 2013: Contract Amount: 370,000,000: 370,000,000 on February 28, 2013: 370,000,000: 370,000,000 (Additional Tax) (Additional Tax) at the price, including packing, the same fran products in China, which are in progress two times at the time of the first approval, were written in writing and sealed on that part (hereinafter referred to as “the first approval clause”).

) Article 6: The delivery place of the goods under the conditions of delivery shall be the place designated by the defendant, and the freight and other expenses required for the delivery to that place shall be borne by the plaintiff as well as any loss.

Article 9:The examination of the goods shall be conducted at the designated place of the defendant by the inspector designated by the defendant. Article 11: 1) The payment method shall be made by the following approval method: 40% (within a week from the contract date) intermediate payment: 50% (within a week from the contract date) intermediate payment: 50% (within a week from the contract date) intermediate payment: Article 12: 10% (within a week from the last inspection date) defect guarantee (within a week from the contract date): the plaintiff shall be responsible for the warranty of the quality and performance of the goods. 2) The plaintiff shall immediately provide repair or replacement for the goods under the guarantee period, and take measures to ensure that the quality and performance of the goods are not impeded in the defendant's operation, in the event of a breakdown due to the defect in the material, design, production or transportation of the goods under the contract, at the direction of the defendant.

1. PALE LADER (RGV) PALE transfer equipment SETING ROM is PALET as M/C and STRCKER, WASHING ROM, SETING ROM in accordance with the work order entered.