logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원논산지원 2016.01.14 2015가단819
유치권부존재확인
Text

1. The defendant B's lien on each partitioned building listed in the attached list 1 to 3 and the attached list 5.

Reasons

Basic Facts

The establishment of the instant collective security right 1) C is the owner of the “E”, an aggregate building located on the land, D and 1 parcel, Chungcheongnam-gun, Chungcheongnam-gun, and the owner of the instant collective security right. 2) On February 24, 2014, the Plaintiff’s Saemaul Bank and the Plaintiff’s Saemaul Bank established a mortgage agreement on each of the sections listed in attached Table 1 through 4 (hereinafter referred to as the “E”), which are part of the sections constituting the “E” as the secured claim for loans to the Plaintiff’s Saemaul Bank C, as the secured claim, on each of the sections listed in attached Table 1 through 4, of the separate sections listed in attached Table 1 (hereinafter referred to as the “section 1” in the attached Table 2 to 5, and each of the sections listed in attached Table 2 to 5, as the same method, completed the establishment of a mortgage agreement on each of the instant

(1) In the case of the instant building Nos. 1 through 3, respectively, the maximum debt amount is KRW 117,00,000, and the maximum debt amount is KRW 78,000 in the case of the instant building No. 4). 3) The Plaintiff Geum River Saemaul Depository concluded a mortgage contract with respect to the instant building No. 5, which is one of the sections constituting “E” as the secured debt of the Plaintiff Geum River Saemaul Depository’s claim for loans to the Plaintiff, as the secured debt amount, with respect to the instant building No. 5, which is one of the sections constituting “E,” and completed the registration of the establishment of a mortgage for the instant building No. 5, as to the instant building No. 5, on the same day. Defendant B concluded a business registration of “G” under the name of her wife and engaged in the manufacture and sale of the building materials. Defendant B concluded the construction work of “G” and completed the construction work of No. 1500,000,000 won under the name of F on February 2, 2013.

2 A notary public commissioned by Defendant B and C shall be an attorney H, who belongs to the law firm of Han-gu, Han-gu, a notary public, on January 2014.

arrow