(영문) 수원지방법원 2016.06.23 2015가단113541
공사대금
Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

(b) the facts of the basis;

A. On November 11, 2014, the Defendant entered into a contract with Defendant B to receive the following contracts for twit (a structure in the shape of a bridge which accommodates cables to show electricity, etc. from each part of the inside of the building, and for the installation of lighting in the ceiling directly due to high tides, on the ground that displayed goods can be seen to have been seen to have been placed in the ceiling. As such, the Defendant entered into a contract with Defendant B to have the steel connected to the steel at a certain distance from the ceiling and contain pipes, lines, electric lights, etc. on the steel.)

(hereinafter referred to as “the first construction contract”). The contract amount of the unit price for the name of the type and the quantity per size is 1.TRAY W 300,H100 (Subdivision) M 491 2,800,374,800 (Subdivision) M 491 2,800, M 400, M 300,H100, M 303,100, 939,300, M 11,6014, 400, M 11,6014, 400, 110-50, 807, 800, 360, 3600, 300, 300, 2.50, 405, 305, 400, 300, 305, 400, 305, 400, 300, 305, 19

B. Until December 31, 2014, the Plaintiff and the Defendants agreed to perform construction works according to the first construction contract, and to pay KRW 150,000 per capita based on the number of personnel invested in the construction work from January 1, 2015.

(hereinafter referred to as “the second construction contract”). (c)

By December 31, 2014, the Plaintiff completed the Trawa Construction Work under the First Construction Contract, but the Plaintiff failed to complete the Rawa Construction Work, and the Plaintiff completed the Rawa Construction Work along with the Rawa Construction Work from January 2015 to March 2015 under the Second Construction Contract.

Defendant C Co., Ltd (hereinafter “Defendant Co., Ltd”) paid to the Plaintiff KRW 20 million on December 12, 2014, and KRW 2985 million on January 12, 2015. Defendant B paid to the Plaintiff KRW 16,00,000 on February 16, 2015, KRW 1575 million on March 12, 2015, and KRW 5 million on March 13, 2015.

(806 million won).