logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2018.05.04 2017나2048698
손해배상(기)
Text

1. The part of the judgment of the court of first instance against the plaintiff equivalent to the amount ordered under paragraph (2) shall be revoked.

2...

Reasons

1. Basic facts

A. From December 26, 2002, the Plaintiff, from around December 26, 2002, is a person who, after having imported or secured by means of purchasing from a domestic manufacturing company, household items and ideas such as radio, scacker, and scambling, etc. abroad, operated the business of selling them on consignment through a third party’s online shopping mall, etc. or selling them through a direct Internet shopping mall (hereinafter “instant business”).

B. From December 2012, the Plaintiff indicated two containers as follows: (a) one office building on the ground of Kimpo-si D (hereinafter “instant land”); (b) three offices of the warehouse building (attached Form A, B, Cdong); (c) four offices of the tent building (attached Table E, F, G, H Dong); and (c) three offices of the container appraiser E; (b) two offices of the container; but (c) two units of containers were two units of containers; (d) it was indicated as two units of containers as one building on the south of the E-Dong area of the building; and (e) it was merely indicated as two units of containers on the premise that three units of containers exist.

【Written Expert E’s Expert E’ (hereinafter “instant Expert E’)

) See 137 pages). (See 137 pages 137. (2 Dong buildings are 2nd floor structures adjacent to the southwest of the building E, and 1 Dong is installed adjacent to the southwest of the building F consent, and 1st floor structures connected to the south south of the building F consent; hereinafter collectively each of the above buildings and containers operated the instant project in a building connected to each other and structure used as a whole. At approximately 13.5 meters above the ground between the two poles adjacent to the southwest of the warehouse A consent, and installed at approximately 67 meters away from approximately 67 meters away to the south of the warehouse A consent, and at approximately 13.5 meters above the ground ( approximately 3 meters away from the center of electric wires) installed and managed by the Defendant ( approximately 22,900 V in the direction of the ground)

(The allocation of the instant place of business and high-tension vessels is as shown in the attached Form 3.

July 26, 2014

arrow