logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2018.04.24 2016가단355458
대금반환 청구의 소
Text

1. The Plaintiff (Counterclaim Defendant) 63.0% from the Defendant (Counterclaim Plaintiff) 63.0% of Laminated Laminated Lg, Calz 120 x 160 to 170m).

Reasons

Basic Facts

B, around October 2013, the Plaintiff purchased the forest land D located in Yandong-gu, Yandong-gu (E forest land 276.8 square meters and F forest land 380.9 square meters; hereinafter “each forest of this case”) from C, and decided to newly construct a tree house on the land of each forest of this case.

The Plaintiff (hereinafter referred to as the “Buyer”) and the Defendant (hereinafter referred to as the “seller”) shall place two copies of this contract in order for the seller to enter into and verify the sale contract for the sale of rectangular tree materials as follows, and then the buyer and the seller shall keep one copy of each contract:

1. The terms and conditions of sale and purchase (1): 120 meters x 170 meters x 19,059 x 4,860 x 4,860 x 42,626,740 x 4,860 x 4,860 x x 4,860 x : 50 x : 5. 5 April 23, 2014: 5: 55, 576,044//300 60 x , 37,050, 696/300 x 40% x and 40% x , in the event that the seller fails to perform this contract, or fails to perform this contract, the seller shall return the down payment.

(8) A buyer shall request a seller to prepare a working drawing, the seller shall submit the final work drawing to the buyer, and the buyer shall conclude a contract after confirming the final drawing.

(9) A buyer shall confirm goods at the time of acquiring a product and shall not file an action against any quantity or defect problem of a product after such confirmation.

(10) When the buyer's deposit of the contract deposit is delayed from the date of the contract, the date of production of the tree materials may be delayed, and the date of receipt may be changed accordingly.

2. The delivery of goods: The buyer shall take over the goods on the date designated by the seller, and all all all the expenses incurred due to the delay in taking over by the buyer shall be borne exclusively by the buyer.

except that.

arrow