(영문) 부산지방법원 2021.03.18 2020나49652
가설자재임대료
Text

1. Of the judgment of the first instance, the part concerning the claim for rent shall be modified as follows.

A. The defendant, 1) the plaintiff B, 6.

Reasons

1. Facts of recognition;

A. The deceased A (hereinafter “the Deceased”) was a person engaged in the business of leasing construction equipment under the trade name of I, and the Defendant is a company established for the purpose of civil engineering work business.

B. On June 11, 2018, the Deceased’s agreement between the Defendant and the Defendant to lease various temporary materials necessary for the Defendant’s work (hereinafter “the instant temporary materials”), such as pipes, oil pumps, clamping, scalpp, artificial poppy, writing, linked poppy, connected pin (hereinafter “instant temporary materials”). (hereinafter “the instant products and terms of lease”).

(a) A separate value-added tax;

(b) Unit price for lease and loss by item: The amount of lease referred to in the table of separate rental rates = [basic fee (one-day unit price x time of use] ¡¿ the name and standard of quantity, and quantity of each item shall be calculated for the standard of delivery delivery.

2. Date of commencement of a contract: Settlement conditions on June 3, 2018: Cash within 30 days after the end of each month.

4. Delivery place: A construction site where the defendant constructs and supplies I’s deceased.

5. The defendant shall pay 2% interest per month to I (the Deceased) where the rent is in arrears.

In addition, the unpaid rent shall be paid immediately along with the full return of the leased materials.

8. Disposal of loss: The defendant shall settle the loss at the time of returning the leased materials, and the damaged quantity shall settle the loss and loss as the present generation of the materials to return the materials.

9. Four months, the base date of which is 120 days in the remarks column of the new pump of the new re-ship (as referred to in subparagraph 12 of the 120-day unit price table (No. 120-day unit price table).

It shall be used, and the high unit price shall apply from the rent for five months.

13. 80% of the loss in respect of the parts of the materials put into storage in excess at the time of the settlement of the materials.

A lease contract has been entered into, and its main contents are as follows:

(c)

According to the instant lease contract, the Deceased leased the temporary materials of this case from June 1, 2018 to the Defendant’s request every month.

The Deceased shall lease each month from June 2018 to September 2019 as shown in the attached list at the end of each month.