(영문) 수원지방법원 2016.09.13 2015구합68957
감봉처분취소
Text

1. The Defendant’s disciplinary action against the Plaintiff on March 23, 2015 shall be revoked for three months of salary reduction.

2. The costs of the lawsuit are assessed against the defendant.

Reasons

1. Details of the disposition;

A. The Plaintiff is a chief of the maintenance team and a maintenance company, who performs the duties of establishing and managing the maintenance plan of the dedicated helicopter (C; hereinafter “instant helicopter”) in possession of the above aviation charges, as well as the chief of the maintenance team and the chief of the management team who exercises overall control over the maintenance duties.

D is a slope serving in the same aviation unit, a responsible mechanic and inspector for the instant helicopter, and E is a slope serving in the same aviation unit, and is a mechanic and inspector for the instant helicopter, and F is a mechanic serving in the same aviation unit, and is a mechanic for the instant helicopter.

(hereinafter referred to as the "Plaintiff, etc." in combination with the plaintiff D, E, and F.

Plaintiff

On October 24, 2014, around 10:10:10, an accident occurred due to high-pressure gas discharged from the auxiliary power plant, which was caused by the cover of the auxiliary power plant of the said helicopter and damaged by the heat above the rear dynamic body (hereinafter referred to as “instant accident”) by placing it in the main power engine engine engine engine engine of the instant helicopter, by independently manufacturing vinyl pipes using general vinyl and mosing tape in the said helicopter (hereinafter referred to as “instant washing method”) on October 24, 2014.

C. On March 23, 2015, the Defendant: (a) took a disciplinary measure against the Plaintiff for three months of salary reduction (hereinafter “instant disciplinary measure”); (b) two months of suspension from office for D; and (c) one month of salary reduction for E and F.

According to the reasoning of the disciplinary action, according to the maintenance bridge of the instant helicopter, it is stipulated that the protective body should be installed by using the timely protective materials and tapes prior to washing the power equipment, and the part of the gas and power equipment shall be protected. When washing the power equipment, the main and auxiliary power equipment covers all.