logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원서부지원 2016.05.26 2016가단4031
건물명도
Text

1. The defendant connects the plaintiff with each point of 1, 2, 3, 6, and 1, as indicated in the attached list, in sequence.

Reasons

1. On November 25, 2014, the Plaintiff terminated the lease contract (deposit: 5,00,000, monthly rent: 50,000, monthly rent: from November 26, 2014 to November 25, 2015) with the Defendant on November 25, 2014 with respect to the portion (a) of 58 square meters in the ship connected each point in sequence with the drawings indicating the real estate indicated in the separate sheet, on the grounds of the delay of the Defendant’s vehicle located in the claim indicating the claim, and the Plaintiff claims the delivery of the building as a result of restitution.

2. Article 208 (3) 1 of the Civil Procedure Act of the applicable provisions of Acts (Judgment without holding any pleadings due to the submission of a written reply);

arrow