Text
1. The Defendant: KRW 40,981,259 for the Plaintiff and KRW 20% per annum from January 30, 2014 to June 30, 2015.
Reasons
1. The following facts may be found either in dispute between the parties or in combination with Gap evidence 2, Eul evidence 2 and 8 (including paper numbers; hereinafter the same shall apply) and the purport of the entire pleadings as a result of a request to the appraiser A by this Court for appraisal.
원고는 2013. 8. 16. 피고와 사이에 부산 영도구 동삼동 1125-37 지상 한국해양수산개발원 건립 기초공사를 위한 천공 및 파일 항타(杭打)공사(이하 ‘이 사건 공사’라 한다)를 대금 2억 735만 원(부가가치세 포함, 이하 같음)에 하도급 받기로 하는 계약(이하 ‘이 사건 공사계약’이라 한다)을 체결한 후, 이 사건 공사를 수행하여 2013. 11. 30.경 완료하였다.
B. At the time of the conclusion of the instant construction contract, the Defendant had a base-to-sto-sto-sto-sto-sto-sto-sto-sto-sto-sto-sto-sto-sto-sto-sto-s to-s to-s to-s to-
However, since August 23, 2013, the Plaintiff was found to have been in depth more than the value of the stratostostostostostos tostostos tostos tostos tostos tostos tostos tostos tostos tostos tos tos tos tos tos tos tos tos tos tos tos tos tos tos to
C. The files (SPHC files) that the Plaintiff and the Defendant agreed to use for the instant work are 15 meters in length, and in order to conduct the instant work, 2 files are used, and 3 files are used, in order to conduct the instant work in depth from 15 to 30 meters underground, and 3 files are used, in order to conduct the instant work in depth from 30 to 45 meters underground.
Where the underground base of the construction area of this case is in depth of 18-28 meters underground, such as the numerical value of the ground surface map and the earth surface map provided by the original defendant, it is sufficient to use two files. However, in fact, the file is in depth of 19-38 meters underground, and it is necessary to use three files.
Therefore, the number of files that the plaintiff originally predicted is the number.