(영문) 수원지방법원 2015.07.15 2014고단6327
사기미수등
Text

Defendants shall be punished by imprisonment for eight months.

However, the execution of each of the above penalties shall be suspended for two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

[Judgment of the court below] On June 21, 2012, the Suwon-si entered into a contract for the construction of the road (hereinafter referred to as "the construction of the road") and the construction of the road (hereinafter referred to as "the construction of the road") in Suwon-si and Suwon-si, Suwon-si, with the content that the contract amount of the construction of the road shall be KRW 1,61,359,000, and the victim FF Co., Ltd. (hereinafter referred to as "F") entered into a subcontract on August 24, 2012 with the part of the construction of the road of the construction of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building of the building.

On September 24, 2012, F entered into a soil and sand transport contract with the content that F pays 34,000 won per truck to G, on condition that F will drive the truck in 13 cubic meters above and transport it, based on 25.5t truck at the site of this construction, Defendant G Co., Ltd. (hereinafter referred to as “G”) and the earth and sand loaded at the site of this construction. On October 25, 2012, F changed the terms of the contract to raise the cost of transporting soil and sand per 37,000 won per truck on 25.5t truck. When paying the cost of transporting soil and sand per 13 cubic meters of soil and sand, F would collect the total cost of transporting soil and sand after collecting the shipment certificate from G.

On November 2012, 2012, Daea Construction submitted the second construction machinery part inspector (the construction cost: 204,639,600 cubic meters) to the effect that he/she transported 5,308 cubic meters (the construction cost: 204,639,600 cubic meters) among earth and sand from 86,707 cubic meters (the design volume was changed to the 86,707 cubic meters after the alteration of the first design) of the total design volume of 88,058 cubic meters (the construction cost was changed to the 86,707 cubic meters) at the water level, and the second construction machinery part inspector to the effect that he/she transported 27,675 cubic meters (the construction cost: 102,397,500 cubic meters) around May 2013, respectively, to the effect that he/she completed the completion inspection of soil and sand transport from around September 2013.

Defendant

B B served as the Director of the F from February 21, 201 to February 21, 2013, and on February 21, 2012.