(영문) 청주지방법원 2016.10.13 2015가합974
공사대금
Text

1. Defendant B Co., Ltd. shall pay to the Plaintiff KRW 26,50,000 as well as its annual interest from August 25, 2016 to October 13, 2016.

Reasons

1. Basic facts

A. The Plaintiff is a person who conducts the construction and interior construction business, and Defendant B (hereinafter “Defendant Company”) is an external chain business entity, and Defendant C is the representative director of the Defendant Company.

B. The Plaintiff and the Defendant Company entered into a contract for the construction of artificial medicine E in the Mageo-gu, Seocheon-gu, Seocheon-gu, Seocheon-gu, Seocheon-gu, 103. The Plaintiff started the said construction on January 25, 2014 and started the said construction in the same year.

4. 8. Completion of the above construction

(hereinafter referred to as the “First Corporation”)

The Plaintiff and Defendant C entered into a contract for the artificial engineering construction of the Republic of Korea (F, Dong-gu, 203 Dong-dong, 1501) with Defendant C residing, and the Plaintiff started the said construction on March 20, 2014 and entered into the same year.

4. 5. Completion of the construction

(hereinafter referred to as the “Second Corporation”) d.

The Plaintiff and Defendant Company entered into a contract for the artificial engineering construction of restaurant H located in Dong-gu, Nam-gu, Chungcheongnam-gu, Seoul. The Plaintiff started the foregoing construction work on August 26, 2014 and started the same year.

9. 25. Completion of the above construction

(hereinafter referred to as “third party Corporation”). (e) The above Corporation

The Plaintiff and the Defendant Company entered into a contract for the artificial engineering works at the J Points located in Cheongju-si. The Plaintiff started the said construction works on August 20, 2014 and entered into the same year.

9. 15. Completion of the construction

(f) The foregoing construction work is referred to as “No. 4”; (f) Defendant C is entitled to KRW 50,000,000 on January 27, 2014; and (c) the same year

2. 50,000,000 won for the same year; and

3. 3. 30,00,000 won, 50,000,000 won on the 14.14. of the same month, and 22.40,000,000 won on the 22.42. of the same month, and 31.50,000,000 won on the 31.50,000,000 won on the 35.25.2014, the Defendant Company

7. 24.20,000,000 won, and the same year.

8. The construction cost of KRW 85,000,000 in total was paid for each of the construction cost of KRW 15,000,000.

[Ground of recognition] Facts without dispute, purport of whole pleading

2. Determination on the cause of the claim

A. The Plaintiff and the Defendants on the summary of the parties’ assertion are based on the construction cost spent after completion without having set the construction cost in advance.

arrow