(영문) 인천지방법원 2021.01.26 2020가단249881
구상금
Text

1. The defendant's KRW 8,926,80 for the plaintiff and 5% per annum from July 30, 2020 to January 26, 2021.

Reasons

1. Basic facts

A. The Plaintiff is a mutual aid business entity that entered into a comprehensive mutual aid agreement with E Co., Ltd. (hereinafter “instant mutual aid agreement”) with respect to D buses (hereinafter “instant buses”).

2) The Defendant is a contractor awarded a contract from the Incheon International Airport Corporation for “F Corporation” (hereinafter “F Corporation”).

The Defendant closed the roads from the Round to the JC at the entrance of the airport for the instant construction, and shut down the roads in approximately 200 meters away from the direction of JC at the entrance of the airport at the entrance of the port at the port of the port of the port of the port of the port of the port of the port of the port of the port of the port of the port of the port of the port of the port of the Republic of Korea, and installed the PE drum (drums of plastic materials filled with water or sand) and the PE drums (temporary drums of plastic materials) for shocking the road at the point of blocking the road.

B. On July 3, 2015, G around July 3, 2015, around 01:10, around 440-year, Jung-gu, Incheon, a two-lane road near the North International Airport Highway, and the bus in this case was driven along the two-lanes at the entrance of airport JC at the entrance of the airport from the tri-distance at the entrance of the airport.

Although the location is 70 km at the highest speed of 70 km, G was due to an accident where the fence of the PE protection wall installed at the location where the road in the direction is obstructed was discovered later, and the PE protection wall and the center is shocked as it is, without due care to comply with the speed of restriction, and due care to accurately manipulate the course of the front-way, and to prevent the accident by accurately manipulating the steering direction and the brake system, and at the speed of about 100 to 131 km in the city (hereinafter “instant accident”). (2) At the instant accident, G and bus passenger H, I, J, K, L, and M, who are drivers of the instant accident, suffered each injury, and I’s cell phone was damaged.

3) As to the instant accident G, a summary order of KRW 3,000,000 was filed for a violation of the Act on Special Cases Concerning the Settlement of Traffic Accidents.

(c)

The plaintiff is entitled to pay the insurance money.