(영문) 인천지방법원 2015.11.18 2014가합55242
손해배상(기)
Text

1. The Defendants jointly committed against the Plaintiff KRW 99,764,450, and KRW 54,054,00,000 among them, shall be as from January 10, 2013, and KRW 45,710.

Reasons

1. Basic facts

A. The Plaintiff is a party’s status 1) The Plaintiff’s multi-purpose sports facilities calculated on the ground 771-5, Gyeyang-gu, Incheon, Gyeyang-gu (hereinafter “instant sports facilities”).

In order to newly build the above sports facilities, civil engineering and landscaping works of the above sports facilities (hereinafter “instant construction”).

A) A local government that ordered and entered into a contract with the Defendants is the local government that ordered the instant construction and entered into a contract. (2) Defendant Seocho-Tech Co., Ltd. (hereinafter “Defendant Seocho-Tech”) is a design company that takes charge of the design of the instant construction. Defendant Ko Man-si Co., Ltd. (hereinafter “Defendant Ko Man-si”) is a construction company that takes charge of the execution of the instant construction, and Defendant Sam Jong-si C&C Co., Ltd. (hereinafter “Defendant Sam-si C&C”) is a supervisory company that takes charge of the supervision of the instant construction.

B. On June 4, 2009, the Plaintiff entered into a contract for the design and authorization of the instant sports facilities by setting the total service cost as KRW 9,441,00 between Defendant Seohae Technology Foundation, the architect office’s towing, the Hysung Electric TTS Co., Ltd., and KNNE. Of them, Defendant Seohae Technology Foundation was in charge of the design for the portion of civil engineering and landscaping at KRW 68,101,00, and completed the design for the portion of civil engineering and landscaping around November 2, 2009. 2) On March 3, 2010, the Plaintiff decided to additionally establish the indoor sports hall on March 3, 2010; on March 23, 2010, the Plaintiff concluded a contract for the design and construction of the instant sports facilities at KRW 9,41,00 among the design and construction cost of the instant sports facilities at KRW 68,100,000; on March 23, 2010.

3 The plaintiff is completed.