Text
1. On November 29, 2012, the Defendant imposed corporate tax of KRW 14,976,876,020 against the Plaintiff for the year 2010.
Reasons
1. Details of the disposition;
A. On April 2, 2001, the Plaintiff is a company established by dividing the Korea Electric Power Corporation. The Plaintiff is operating a new integrative power plant.
No 1 No. 1 No. 1 373,005,005 Speol, 1341,200 KM-V/V/210, 1984,750 4 GENuuxiic 4,750 Gail, 13750, 500, 500, 1375, 137,000, 137,005, 1340, 200, 1341,50, 200, 6M-V/V/210, 1054, 50, 57, 547, 57, 57, 5033, 54, 57, 503, 54, 57, 196, 19
B. Around July 1994, the Plaintiff entered into a contract with GE Energy International LLC in the United States (hereinafter “GE”) for the production and supply of eight posters and four steams, which are the power generation facilities of a new human and complex thermal power plant. Accordingly, the construction of the above power generation facilities was completed around July 1, 1997.
However, on July 7, 2010, the 9th steam turbine and power generator turbine of the New Mancheon Consolidated Power Plants cut and explosiond on July 7, 2010, and caused an accident that results in the suspension of power generation (hereinafter “instant accident”).
In the process of restoring damage caused by the instant accident, GE proposed that the following specifications be supplied to the Plaintiff at USD 5,603,00:
(hereinafter referred to as “instant main facilities” in total, including the steam 1 steam tws and 2 power generatorss as follows, and the following table facilities are collectively referred to as “instant power generation facilities.” Since then, the Plaintiff accepted the said proposal and agreed with the GE on July 29, 2010.
1. GE shall provide the Plaintiff with the instant main equipment free of charge to the US port.
In addition, the plaintiff bears all expenses related to removal, installation, change of foundation/redesign and engineering.
2. The plaintiff shall perform the scope of removal and installation except for the supply of main equipment.
The GE shall be the original time necessary for the restoration work.