(영문) 부산지방법원 2014.09.18 2013가합16216
약정금 등
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The party-related Plaintiff is a person engaged in the manufacturing business of a new marries in Thailand (the windows inserted in the sand position punishment between the inner and outer windows to make the new marbing floor cover) with the trade name of “stock company C,” and the Defendant is a person engaged in the manufacturing and selling business of electric marls, machinery, and machinery with the trade name of “D(E).”

B. (1) The Plaintiff asserted that the first police officer around April 17, 2012 was around March 2012, 2012, and the Defendant asserted that it was around March 10, 2012.

The introduction of F reveals that the defendant was aware of the defendant, and the defendant's machinery was viewed in the defendant's Macheon Factory.

(2) On May 31, 2012, the Plaintiff requested the Defendant to produce the sample of the new works desired by the Plaintiff using the said machinery, and the Plaintiff entered into a contract with the Plaintiff to install the said machinery in a factory of the Plaintiff’s Thailand (hereinafter “instant contract”); after confirming the sampling (Evidence B No. 15) produced by the Defendant, the Plaintiff entered into a contract with the Plaintiff to install the said machinery by installing a telerogate and pressra in order to supplement the quality of the product (hereinafter “instant contract”); and the said machinery “instant machinery”).

(3) The Defendant stated in the agreement on May 31, 2012 on May 30, 2012, but appears to have been drafted on May 31, 2012, which is the date of conclusion of the instant agreement.

Preparation of the following agreement (hereinafter referred to as the “instant agreement”) to the Plaintiff: ① Magglera, ② reimburses the Plaintiff for the production amount of this city within the same level as sampling in the production of a set of pressesra products.

· was issued.

The name of construction: 1,50,000 won for the second revised construction cost of unit price table 145,50,000 won for each type and size of 1,20,000 won for each type and size of 1,50,000 won for each type and type of 18,000 won for each type of storage tank 15,000,000 won for each type and type of 20,000 won for each type of 1,5,000 won for each type and type of 15,000,000 for each type of 1,750 meters for each type and type of 20,000 won for each type and type of 1,750 meters for each type and unit price table for each type of 1,50,000 won for each type of 22,50,000 won for each type of 15,00 won for each type and type of 15,000 won for construction

: 7,00,000 cuts: 145,50,000 won in the aggregate of 7,000,000 won.

arrow