Text
1. The Plaintiff:
A. Defendant B Co., Ltd. shall set out the real estate in attached Form No. 1.
Reasons
1. Basic facts
A. On September 14, 2009, the Plaintiff obtained authorization for the establishment of a housing redevelopment project from the Si interest market on September 14, 2009, obtained authorization for the implementation plan on October 8, 2015, obtained authorization for the management and disposal plan on February 18, 2016, and publicly announced the management and disposal plan on the same day.
B. The land where each of the real estate listed in the separate sheet owned by the Defendants is located is included in the rearrangement zone for the rearrangement project implemented by the Plaintiff.
C. Defendant B Co., Ltd. leases and occupies the entire two floors of the real estate indicated in the separate sheet No. 2.
(e) Defendant C: (a) connect 1,2, 3, 4, 5, 6, and 1 points in order among the real estate listed in the attached Table 4 list; (b) connect 7,8,9,10,11, 12, and 7 points in sequence; (c) connect 1,2,000 square meters of each of the said drawings; (d) connect 2,000 square meters of each of the said drawings; (c) connect 2,000 square meters of each of the said drawings; (d) connect 2,000 square meters of each of the said drawings; (e) connect 46,000 square meters of each of the said drawings; (e) connect 2,000 square meters of each of the said drawings; (e) connect 46,000 square meters of each of the said drawings; (e) connect 6,000 square meters of each of the said drawings; (e) connect 2,000 square meters of each of the said drawings;