logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원안산지원 2017.10.25 2015가단20520
손해배상
Text

1. The Defendant’s KRW 9,609,308 with respect to the Plaintiff and KRW 5% per annum from April 26, 2017 to October 25, 2017.

Reasons

1. Basic facts

A. On July 19, 2014, while the Plaintiff was operating the Gosan-si Da main store No. 1 and 4 of the 1st underground floor of the building C (hereinafter “instant shopping mall”), the Plaintiff prepared a lease agreement with E to lease the instant shopping mall, and accordingly, operated the instant shopping mall along with F, E.

B. On November 2014, the Defendant, at F’s request, installed an electric temperature water meter (hereinafter “instant electric temperature gauge”) in the main room of the instant commercial building.

C. On March 11, 2015, at around 05:42, a fire occurred in the instant commercial building, and the same day was extinguishing on the same day.

(hereinafter “the instant fire.” As the instant fire, the Plaintiff suffered 12,011,635 won for removal works, etc., as the interior interior of the instant commercial building was spamed with the spam in order to extinguish fire or extinguish fire.

Under the alcohol display place on the shopping mall of this case, a shotton burnedd with the wall from the point where the wall and the floor are linked to the wall was identified, and no other fire trace was found.

위 지점에 롱부츠 등이 들어 있는 박스가 소훼된 상태로 있었고, 박스 부근 바닥에는 벽체 2구 콘센트에 끼워진 플러그와 연결된 1.25㎟×2C 전선과 전기온수기 전원코드 플러그가 끼워진 콘센트와 연결된 3C×0.75SQmm 전선이 단선된 채 놓여 있었다.

E. According to the fire site inspection report, the above 3C x 0.75S Qm electric wires were below the standard to be used as the electrical power line connected to the electric temperature of this case. However, it was presumed that the fire was caused due to the resistance caused by the failure of the specifications to reverse the electric power line, which does not fit each other, and it was presumed that the fire was caused due to the lack of heat.

【Legal basis for recognition” 【Nos. 1-5, 8 and 9 (including additional numbers)’s entries and images, the inquiry results on the chief of Ansan fire station of this court, and the purport of the entire pleadings.

arrow