Text
Defendant
A Imprisonment for six months, Defendant B shall be punished by a fine of 10,000,000 won.
However, the defendant A.
Reasons
Punishment of the crime
Defendant B Co., Ltd. is a corporation established for the purpose of E-Si housing construction and civil engineering work in E-si, D, E-si, and F with permission for development for the purpose of site creation for Class I neighborhood living facilities, and Defendant A is the representative director of B.
1. A person who intends to modify matters for which permission for development activities was obtained from the defendant A shall obtain permission from the competent authority;
Nevertheless, without obtaining permission to alter development activities between March 6, 2019 and March 28, 2019, the Defendant cut the area of the ground that was permitted in the above E forest from 3,064 cubic meters of cut land to 3,064 cubic meters of cut land, as indicated in the attached Table, on the basis of the distance between the cross-area in each side point and the side point (see, e.g., title 1; 36,076 cubic meters of exceeding 33,012 cubic meters, and 36,076 cubic meters of the cut volume exceeding 21,240 cubic meters of the cut volume permitted in the above F forest and land, and cut the area by cutting the area exceeding 23,261 cubic meters from 261 cubic meters of the cut volume exceeding 56,273 cubic meters, respectively, using porac meters of 56,273 meters.
2. The Defendant Company B cut the Defendant’s business beyond the permitted content without obtaining permission for change of development activities as stated in paragraph (1).
Defendant B Co., Ltd. is a corporation established for the purpose of Leecheon-si C, Housing construction, and civil engineering work, etc., for the purpose of creating a site for Class I neighborhood living facilities, and is performing construction work in E and F. The defendant A is the representative director of the corporation B.
1. A person who intends to modify matters for which permission for development activities was obtained from the defendant A shall obtain permission from the competent authority;
The Defendant obtained permission from March 6, 2019 to March 28, 2019 from around March 6, 2019, for the cutting volume exceeding 33,064 cubic meters and exceeding 36,076 cubic meters from the cutting volume permitted from the said E forest, and obtained permission from the said F forest.