logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원안양지원 2013.12.19 2012가합4591
공사대금
Text

1. The Defendant’s KRW 82,144,300 as well as 6% per annum from July 13, 2012 to December 19, 2013, and the following.

Reasons

1. Basic facts

A. On March 30, 2009, the Defendant et al. and two companies, including the Defendant et al. were instructed from Jeju City and the Supervisory Board to install provisional soundproof walls, etc. in case of civil petitions arising from noise during construction while performing construction works after being awarded a contract for the infrastructure construction of A District Urban Development Project (hereinafter “instant infrastructure construction”).

B. On October 15, 2009, the Defendant’s On-the-spot B received an estimate from the Plaintiff and two companies located in Jeju City with respect to construction works, such as provisional soundproof walls (hereinafter “instant construction works”), and sent an order stating the following (hereinafter “instant order”).

The unit price of the quantity per unit of the name name name (excluding value-added tax) H=8.0M 1.0M (300 x 300 x 300 x 10 x 15) M 366 613,180 224,423,880 2 temporary fences (EGI fences) H-3.0 x 2.0 138,000 x 2.0 x 75,900,000 in total 300,323,80

C. On December 22, 2010, the Plaintiff commenced the instant construction work after transporting the materials under the instant order from the land to Jeju-do using vessels, and on December 22, 2010, the Plaintiff and the Defendant entered into a subcontract with the period of construction from December 22, 201 to December 31, 201, setting the contract amount of the instant construction work as KRW 491,360,000, and the construction period as to the instant construction work between December 22, 2010 to December 31, 201 (hereinafter “instant contract”), and the specifications attached to the said contract are as follows.

The unit price per unit price per total quantity of materials (excluding value-added tax) cost (excluding value-added tax), labor cost (excluding value-added tax), H6.0M 1.0M H-300 x 300 x 10 x 10 x 36 M 616 M 6,000 616,456,000 x 477,000 174,582,000 139,000 for 582,000 for 50,874,000 for 50,874,000

D. Around July 2011, the Plaintiff’s sn beamline (H-BAM, H-PILE) was found on the ground of the construction site while conducting the instant construction work. The residents are the residents.

arrow