(영문) 서울중앙지방법원 2015.11.27 2014가합62331
손해배상
Text

1. The defendant shall pay to the plaintiff limited liability company A KRW 40,531,302 as well as his/her annual interest from January 15, 2015 to November 27, 2015.

Reasons

The plaintiffs alleged by the plaintiffs, the defendant, from "D," a building office with the main office in Kazakhtan, the defendant, the defendant, at the same time, re-subcontracted the structural design services among the design services of the new apartment construction work in the Kazakhtan's administrative water supply system and the new apartment construction work in the Kazakhtan.

Around August 2012, the Defendant’s proposal, which requires a local labor force and technology to perform the above structural design services, entered into a basic contract with the Defendant on the following terms: (a) between the Plaintiff and the Defendant; (b) between the Plaintiff and the local employee directly employed the Plaintiff, with respect to the Defendant’s modification work of E1 block of “Faow” and the rescue design work for E2 block, F block, G block, etc., which the Defendant was sub-subcontract subcontracted from “D; and (c) the Plaintiff B, with respect to the performance of the contract between the Plaintiff and the Defendant, performed the duties of subsidizing the costs incurred in the Plaintiff; and (d) performed the duties of sharing the work of preparing the implementation drawings; and (e) in return, concluded a basic contract with the effect that the Defendant pays the Plaintiffs

The plaintiffs and the defendant concluded four contracts for each of the following businesses in accordance with the above basic contracts:

(3) The contract amount: 50% (60,00 won) at the time of the contract, and (4) at the time of the delivery of the shop design: 15/1,000: The service period: From September 15, 2012 to December 30, 2012 between the plaintiff B and the defendant (the automatic completion of the supply of the executing book) on September 15, 2012, the "Preparation of the Local Structure of the Fta E-2 block (the "E-2 block structure drawing service contract" hereinafter referred to as the "E2 block structure service contract"): The contract amount: 50% at the time of the conclusion of the technical standard service contract; 1.4 million won at the time of the contract; 4.0 million won at the time of the supply of the shop design; 3.2 million won at the time of the execution of the contract; 4.2 million won at the time of the delivery of the two million won (the execution design) at the time of the contract.