Text
1. The plaintiff's main claim is dismissed.
2. The plaintiff's conjunctive claim is dismissed.
3...
Reasons
1. Facts of recognition;
(a) Treatment Construction Co., Ltd. 1) Execution Deposit for Treatment Construction Co., Ltd. (hereinafter “Treatment Construction”);
(B) and corporation B (hereinafter referred to as “B”).
(B) On September 26, 2011, the Plaintiff entered into a contract with the content that materials, such as the separation blocking equipment required at the F site, are produced and supplied for KRW 5,056,480,00 (hereinafter “instant contract”).
(4) B agreed not to transfer the rights and obligations under the instant contract to a third party without treatment construction document. B was manufactured and supplied as materials, such as separate equipment, according to the instant contract. 2) Treatment Construction: 453,640,00 won under the instant contract with respect to B (hereinafter “instant claim”) for provisional attachment, seizure and collection order as follows; 153,640,000 won No. 159, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 200 won, 201, 201, 201, 201, 201, 201, 201, 201, 202.