(영문) 의정부지방법원 2020.05.27 2019고단4397
업무상과실치상
Text

Defendant shall be punished by a fine of five million won.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

around November 2018, B Co., Ltd. (hereinafter referred to as “B”) received a subcontract from C Co., Ltd. (hereinafter referred to as “C”) for the installation work of the storage tank in the amount of KRW 258,500,000 for the construction work cost during the D Creation Project, and the Defendant is a field manager of the above civil works and a person in charge of overall control over the direction and management of the said construction site.

B entered into a port operation-related equipment contract with E on December 8, 2018, and around December 10, 2018, from around December 10, 2018, three employees of E Co., Ltd. (hereinafter “E”) (hereinafter “E”), including the victim F. (37 years of age) of E Co., Ltd. (hereinafter “E”), carried out tent and sn beaming and porting construction, and the Defendant reported the progress of navigation-related construction from E, etc., and managed the progress of construction.

Around 10:30 on January 4, 2019, the Defendant: (a) the victim, who is an employee, was engaged in dismantling work for the movement of air booms (DHP-80 sp-1.4 tons, gross weight: 3.3 meters), which are construction machinery; (b) the Defendant shall prepare a work plan that includes safety measures, etc. to prevent danger, such as collision, compromise, fall, etc., in performing handling of air booms, which are heavy objects; and (c) shall inform the workers thereof so that they may perform the work accordingly; and (d) in the event of assembling, dismantling, altering, or moving an air boom, etc., the Defendant shall designate the person in charge of the work, and shall instruct and supervise the workers, when booming booms, cancer, etc. on the construction machinery, and performing under repair, checkup, etc. at the bottom of the construction machinery system, the Defendant shall not perform the work plan to inform the relevant workers of the safety engine or safety block, etc., but shall not perform the above work plan.