(영문) 대구지방법원 경주지원 2015.07.22 2015고단125
폐기물관리법위반등
Text

Defendant

A A Fine of 6,00,000 won, Defendant B Company of 1,000,000 won, and Defendant C Company.

Reasons

Punishment of the crime

1. From July 1, 2006, Defendant A is the representative of C Co., Ltd., the main business of which is manufacturing and selling concrete products from the racing-si, and from September 11, 2009, Defendant A is the representative of B Co., Ltd., the main business of which is manufacturing and selling concrete products in F from the racing-si.

No person who violates the Wastes Control Act shall reclaim or incinerate industrial wastes at a place other than the waste disposal facilities permitted, approved, or reported.

1) From around December 1, 2008 to March 2009, the Defendant buried approximately 100 tons of waste concrete, a commercial waste, from G, from its racing city. (2) From February 2, 2012 to March 2, 201 of the same year, the Defendant buried approximately 81.7 tons of inorganic sludge, a commercial waste, from its racing city, at H. The Defendant buried around February 1, 2012.

B. A building owner who intends to start construction of a building shall report a construction plan to the competent permitting authority, as prescribed by Ordinance of the Ministry of Land, Transport and Maritime Affairs. Nevertheless, the Defendant, on December 2, 2012, did not start construction of one-story building on the ground of a general steel structure of a size of 525 square meters in the area of 1st, 1st, J, K, and L in the middle of the racing on December 2, 2012, and did not report the construction plan to the competent authority.

Nevertheless, on December 2012, the Defendant extended the building by forming an office with a size of 25 square meters and a size of 5.6 square meters at the entrance of a reinforced concrete building located in the relevant area without reporting to the competent authority at the I of the racing city.

2. Defendant C Co., Ltd is a corporation that mainly engages in the business of manufacturing and selling concrete products.

The representative of the defendant Gap buried approximately 81.7 tons of inorganic waste, which is commercial waste, at H from February 2012 to March 2 of the same year, from February 2012.

3. Defendant B manufactures concrete products.

arrow